加入收藏 在線留言 聯系我們
          關注微信
          手機掃一掃 立刻聯系商家
          全國服務熱線13620111183

          藥品固體粉末 未知物成分析

          更新時間
          2024-11-22 08:15:00
          價格
          5000元 / 個
          報告用途
          質量評價
          樣品量
          150g
          檢測周期
          10個工作日
          聯系電話
          15915704209
          聯系手機
          13620111183
          聯系人
          李工
          立即詢價

          詳細介紹

          3293619086.jpg

          未知物成分分析是通過綜合的分離和分析手段對復雜的未知化學品的成分進行定性和定量分析,為科研、產品生產、產品開發、改進生產工藝提供科學依據,為企業引進、消化吸收再創新提供強大技術支撐。

          未知物成分分析覆蓋電子、紡織、日化、塑料、橡膠等各個領域,具體包括:

          ? 助劑產品:紡織、皮革助劑(柔軟劑、勻染劑、整理劑等);電鍍(鋅、銅、鉻、鎳、貴重金屬)助劑(前處理添加劑、光亮劑、輔助光亮劑等);塑料和橡膠制品助劑(增塑劑、抗氧劑、阻燃劑、光和熱穩定劑、發泡劑、填充劑、抗靜電劑等);涂料助劑(乳化劑、潤濕分散劑、消泡劑、阻燃劑等);線路板制造化學品助劑;電子助焊劑;陶瓷助劑;鋁合金表面處理助劑;其它精細化工助劑

          ? 油墨產品:墨水,感光油墨等

          ? 化妝品:洗發、護發用品、護膚用品、美容用品、口腔衛生制品等

          ? 香精、香料

          ? 表面活性劑、民用和工業用清洗劑

          ? 有機溶劑: 油漆稀釋劑,天那水,脫漆劑,電子、紡織、印刷行業用溶劑

          ? 水處理劑:緩蝕劑、混凝劑和絮凝劑、阻垢劑等

          ? 石油化學品:潤滑油,切削液等

          ? 氣霧劑、光亮劑、殺蟲劑、脫模劑、致冷劑、空氣清新劑等

          ? 高分子材料

          ? 其它化工產品

          工業診斷分析是指通過樣品或生產過程中微量污染物的鑒定,來查找工業生產過程中的質量事故原因的方法。工業診斷分析需要綜合運用各類常量、微量和痕量檢測技術,主要成分與雜質成分鑒定并舉,有機分析與無機分析并重,成分分析與生產工藝流程分析結合,尤其是對檢測結果的分析和綜合判斷能力要求很高,才能對產品質量事故原因進行分析診斷。

          工業診斷分析業務已涉及精細化工、醫療制品及臨床、造紙、電鍍、精密儀器制造、汽車生產等工業領域。













































          行業資訊:

          On February 3, CNPC Offshore Engineering Company (CPOE) officially delivered the FWP5 engineering package of Russia's Yamal LNG Project to its owner as it was loaded on board in Qingdao City, Shandong Province in China. After one year's construction, FWP5 is the first to be completed among over 20 engineering packages of the Yamal project.

          Yamal LNG project is the world's largest one and located in the extremely cold area in Russia. The project facilities are to be built by modules which are constructed in different regions around the world and then transported to the Yamal Peninsula for on-site assembling. Besides FWP5, CPOE has won the bidding of other three engineering packages, i.e., FWP1D, MWP10A and AMWP4. And the AMWP4 is expected to be completed in the first half of 2016.

          The FWP5 engineering package is constructed by bolting more than 15,000 structural parts, with the dimensional deviation for each part being controlled within 0.1mm. Strict standards are applied during construction, e.g. 114 parameters are measured in order to examine a 12m-long structural part. The project quality of FWP5 is highly appraised by the project owner and the general contractor.


          聯系方式

          • 電  話:15915704209
          • 工程師:李工
          • 手  機:13620111183
          • 微  信:A15915704209